#16 of 30 · AI lab + cloud
Baidu (ERNIE)
Own Kunlun chips, PUE 1.19, and renewable power stuck in single digits.
In plain words
How scores workBaidu scores 45 out of 100 — middle of the pack. Some disclosure or clean-energy commitments, offset by rising emissions or blind spots. Confidence in this score is good confidence (B).
What helps
- Efficiency · Average data-centre PUE of 1.19 and custom Kunlun silicon; ERNIE 4.5 is a mixture-of-experts model.
- Carbon · Yangquan site certified carbon-neutral; 2030 operational neutrality goal.
- Commitments · Carbon-neutral operations by 2030 across six areas including data centres; PUE target 1.14; offsets for the remainder.
What hurts
- Efficiency · No per-prompt figures.
- Carbon · Renewable electricity about 5% (Greenpeace, 2023); 62 GWh of renewables in 2024 against Scope 2 emissions of 777 kt.
- Water · Water cooling with free cooling described qualitatively; no WUE or consumption published.
What nobody knows
- Per-prompt energy disclosed
- Per-prompt water disclosed
- Training emissions in model cards
- Water-use effectiveness reported
- Hardware reuse or e-waste reported
Baidu trains ERNIE on its own Kunlun P800 chips — a 30,000-chip cluster lit in April 2025 — and runs some of China's most efficient data centres (average PUE 1.19). But renewable electricity is a rounding error: 62 GWh in 2024, which Greenpeace put at about 5% of consumption, against Scope 2 emissions of 777 kt location-based. Carbon-neutral operations are promised for 2030, largely via offsets.
Key figures
Per-prompt and fleet metrics. Hover a title for what it means; open “How we got this number” for the working.
ecogpt.co estimate; no company figure.
How we got this number
ERNIE 4.5 is a 424B mixture-of-experts model with 47B active parameters, served on Baidu's own Kunlun P800 chips in data centres with a PUE of 1.19. Uncertainty roughly ±3×.
On-site cooling only, so comparable with Google and OpenAI's figures.
How we got this number
0.25 Wh per prompt × 0.8 L/kWh (estimated WUE for water-cooled sites with free cooling). Counting the water evaporated to generate the electricity adds ≈0.45 mL.
Location-based: what the grid actually emitted. Renewable certificates would bring the market-based figure near zero.
How we got this number
0.25 Wh × 580 gCO₂/kWh (Chinese grid, location-based).
Scope 2 market-based 645 kt; as compiled from the 2024 ESG report.
How we got this number
No disclosure. Baidu describes water cooling with free cooling and a PUE of 1.19, which points to below-average evaporative use; 0.8 L/kWh assumed.
Baidu reports 62 GWh of renewable electricity in 2024 but not the share.
Hardware & materials
The chips, power, copper and future e-waste behind the fleet — the part sustainability reports leave out
GPUs, TPUs or custom accelerators the company runs. Analyst figures are in H100-equivalents, company figures in physical chips.
How we got this number
One disclosed cluster of 30,000 Kunlun P800 chips, plus earlier Kunlun generations and NVIDIA A800/H20 capacity for Baidu AI Cloud. Uncertainty ±2×.
Megawatts the AI fleet pulls. One megawatt runs roughly 750 US homes.
How we got this number
100,000 accelerators × 1.3 kW each, all-in. Fleet power implied by the chip count.
Terawatt-hours per year. One TWh is a year of electricity for about 95,000 US homes.
How we got this number
130 MW × 8,760 h × 80% utilisation. Compute fleet only.
CO₂e emitted making the chips and servers before they answer a single prompt.
How we got this number
100,000 accelerators × 514 kg CO₂e each (chip plus share of the host server). Emitted in manufacturing, before the first prompt is served.
Tonnes of server hardware that will be retired in three to five years.
How we got this number
100,000 accelerators × 17 kg of server hardware each. Tomorrow's e-waste unless reused; generative AI could produce 2.5 Mt of it a year by 2030.
Tonnes of copper in cabling, busbars and transformers.
How we got this number
130 MW × 27 t of copper per MW (cabling, busbars, transformers).
Diesel backup units or gas turbines at the data centres, permitted or observed.
How we got this number
130 MW ÷ 2.6 MW per generator, the average size permitted at US data centres. Permit counts are not published fleet-wide; this is the number a fleet this size normally carries.
Share of retired servers and parts given a second life.
Kilograms of antimony-equivalent, the life-cycle unit for scarce minerals consumed.
Score breakdown
Each pillar is 0–100; weights are fixed across the index
- Average data-centre PUE of 1.19 and custom Kunlun silicon; ERNIE 4.5 is a mixture-of-experts model. Baidu via sustainabilityreports.comReuters via Yahoo Finance
- No per-prompt figures. Baidu via sustainabilityreports.com
- Renewable electricity about 5% (Greenpeace, 2023); 62 GWh of renewables in 2024 against Scope 2 emissions of 777 kt. Data Center DynamicsTracenableBaidu via sustainabilityreports.com
- Yangquan site certified carbon-neutral; 2030 operational neutrality goal. US Securities and Exchange Commission
- Water cooling with free cooling described qualitatively; no WUE or consumption published. US Securities and Exchange Commission
- Annual ESG report with third-party-verified Scope 1–3 (since 2020), PUE and renewable kWh; no AI-specific figures. Baidu via sustainabilityreports.comUS Securities and Exchange Commission
- Carbon-neutral operations by 2030 across six areas including data centres; PUE target 1.14; offsets for the remainder. US Securities and Exchange Commission
- No renewable-share or water targets. US Securities and Exchange Commission
- No enforcement actions on record. US Securities and Exchange Commission
Models
What this company ships, and what each prompt costs
| Model | Weights | Energy / prompt | Water | Training CO₂e |
|---|---|---|---|---|
| ERNIE 4.5 424B total / 47B active (MoE) | Open | 0.25 Wh Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement. | 0.200 mL Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement. | 4,000 t Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement. |
Where the compute lives
Named sites from company disclosures and press reporting
- Beijing HQBeijing, China
- YangquanShanxi, China · Carbon-neutral certified; Kunlun clusters.
- BaodingHebei, China