Index 2026.10b
How the index is scored
Last recomputed Oct 16, 2026. Every input lives in the open — the same data files power the rankings, the profiles and the charts. This page explains the pillars, the grades, how every blank is filled with a labelled estimate, and the factors behind the hardware and materials figures.
Reading a score
What the number, the band and the grade mean
Discloses real numbers and runs mostly on clean power. Still has a footprint, but you can see it.
Some disclosure or clean-energy commitments, offset by rising emissions or blind spots.
A score is the weighted sum of six pillar scores. Each pillar also carries a confidence grade from A (the company published it, with method) to D (little data), and the company grade is the weight-averaged result. A high score with a D grade means the company looks fine on the little it publishes.
Five kinds of number
Published by the company itself. We take it as given and record the scope next to it.
Measured or estimated by researchers or analysts with no stake in the result.
Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.
Arithmetic on a disclosed or independent input using a published conversion factor.
The company publishes nothing on this and no defensible estimate exists.
Pillars and weights
A company's score is the weighted sum of six pillar scores, each 0–100
The nine disclosure checks
- 1.Per-prompt energy disclosed
- 2.Per-prompt water disclosed
- 3.Training emissions in model cards
- 4.Annual environmental report
- 5.Location-based Scope 2 reported
- 6.Data-center locations public
- 7.Water-use effectiveness reported
- 8.Third-party verified AI figures
- 9.Hardware reuse or e-waste reported
Confidence grades
Each pillar carries a grade; the company grade is the weight-averaged result
Company-disclosed with methodology, or independently measured, and consistent across sources.
Disclosed at company level (annual report, model card) but not AI-specific, or disclosed without third-party review.
Derived from hosting partners, architecture or press reporting rather than the company's own numbers.
No disclosure of any kind; scored on what is publicly observable.
Estimates: how every blank is filled
166 of 210 key figures are estimates or derivations; 44 are disclosed or measured
Most companies in the index publish nothing per prompt and many publish nothing at all. Rather than leave a dash, every figure is filled with an estimate whose working is printed next to it (“How we got this number”) and labelled ecogpt.co estimate or Derived. Estimates are order-of-magnitude figures, typically within a factor of three, and they never raise a company’s score: scoring rewards disclosure, and an estimated figure earns the same confidence grade as no figure.
Grid carbon intensities used (location-based, gCO₂/kWh)
- world average grid: 480
- US grid: 390
- EU grid: 240
- French grid: 55
- Chinese grid: 580
- Texas grid plus on-site gas: 420
- on-site gas turbines: 500
- Nordic grid: 30
Hardware & materials
The factors behind the chips, copper and e-waste figures on every profile
Sustainability reports count electricity and water. The hardware behind AI has a footprint of its own — the carbon emitted making chips and servers, the copper in the building, the diesel generators out back, the e-waste at end of life — and almost nobody reports it. Each profile carries nine hardware figures. Where a company or analyst has published a number it is labelled as such; the rest are arithmetic on those inputs using the factors below, each of which cites its source.
What each figure means
- AI chips in serviceGPUs, TPUs or custom accelerators the company runs. Analyst figures are in H100-equivalents, company figures in physical chips.
- Power drawMegawatts the AI fleet pulls. One megawatt runs roughly 750 US homes.
- Electricity a yearTerawatt-hours per year. One TWh is a year of electricity for about 95,000 US homes.
- Carbon baked into the hardwareCO₂e emitted making the chips and servers before they answer a single prompt.
- Future e-wasteTonnes of server hardware that will be retired in three to five years.
- Copper in the buildTonnes of copper in cabling, busbars and transformers.
- Fossil generators on siteDiesel backup units or gas turbines at the data centres, permitted or observed.
- Hardware reused or recycledShare of retired servers and parts given a second life.
- Mineral depletionKilograms of antimony-equivalent, the life-cycle unit for scarce minerals consumed.
Scope matters
Why two honest numbers can differ 170×
Google’s 0.26 mL per prompt counts the water its own data centres consume for cooling. Mistral’s 45 mL per response also counts the water consumed generating the electricity, following a full life-cycle method. Neither is wrong; they answer different questions. The index records the boundary next to every figure, scores disclosure of the boundary itself, and never compares numbers across boundaries without saying so.
Emissions carry the same caveat: market-based totals net out renewable certificates and power-purchase agreements, location-based totals do not. Where both are reported (Meta, Microsoft, Google) the profile shows both. Estimated annual emissions for non-reporters cover the AI fleet only and are location-based.
Glossary
The jargon, in one line each
- Scope 1
- Emissions the company makes directly, e.g. gas turbines or generators it runs.
- Scope 2
- Emissions from the electricity it buys.
- Scope 3
- Everything else in the value chain: making chips and servers, building data centres, suppliers.
- market-based
- Scope 2 after subtracting renewable certificates and power contracts the company bought.
- location-based
- Scope 2 using the real average mix of the local grid, no certificates.
- PUE
- Power usage effectiveness: total facility power ÷ server power. 1.0 is perfect; 1.1 is excellent.
- WUE
- Water usage effectiveness: litres of water consumed per kWh of server electricity.
- 24/7 CFE
- Carbon-free electricity matched every hour on the same grid, not just averaged over the year.
- H100-equivalent
- A way to compare different chips by converting them to the compute of one NVIDIA H100.
- Sb-eq
- Antimony-equivalent: the life-cycle assessment unit for depletion of scarce minerals.
- MoE
- Mixture of experts: a model that only activates a fraction of its parameters per token, which cuts energy per prompt.
- LCA
- Life-cycle assessment: an audited accounting of impacts from manufacturing through use to disposal.
What the index is not
Limits worth knowing before you quote a score
- Not a measure of absolute impact. A small company with a perfect score can still have a footprint; a hyperscaler with a middling score dominates in absolute terms. Use the hardware figures, the calculator and analytics for scale.
- Not real-time. Scores are recomputed monthly or when a material disclosure lands; each profile shows its last verification date.
- Not independent measurement. Where companies disclose, we take their figures and label them disclosed; where third parties measure, we label that independent; where nobody has, we estimate and say so. We do not run benchmarks ourselves.
- Not legal findings. Incident entries summarise public reporting and filings and link to them; allegations are described as allegations.
Independence and corrections
Who makes this and how to challenge it
The index is published by EcoGPT, a Delaware public benefit corporation that also runs an AI assistant at ecogpt.com. That is a conflict of interest, so EcoGPT is not ranked. It does not accept payment from any company it ranks. The newsletter is free.
Companies and readers can request a correction or supply new disclosures at team@ecogpt.com. A disclosed figure always replaces an estimate. Material corrections are noted on the affected profile with the date of change. Every company in the index is offered right of reply before a new edition is published.
Sources
151 references, grouped by type
Company disclosures
- 1.Measuring the environmental impact of delivering AI at Google ScaleGoogle (arXiv 2508.15734) · Aug 21, 2025
- 2.Measuring the environmental impact of AI inferenceGoogle Cloud blog · Aug 21, 2025
- 3.Google 2025 Environmental ReportGoogle · Jun 27, 2025
- 4.Google 2026 Environmental ReportGoogle · Jun 30, 2026
- 5.Circularity in Google's data centers — 8.8 million components harvested for reuse in 2024Google · Jun 1, 2025
- 6.The Gentle SingularitySam Altman (blog) · Jun 10, 2025
- 7.Our contribution to a global environmental standard for AIMistral AI · Jul 22, 2025
- 8.Embodied carbon intensity: 0.66 g CO₂e per exaflop for HGX H100 vs 0.50 g for HGX B200NVIDIA developer blog · Nov 1, 2025
- 9.DGX H100/H200 system user guide — mechanical specifications (130.45 kg)NVIDIA · Jan 1, 2024
- 10.Why AI tools and data centres are driving copper demand (27 t per MW)BHP · Jan 20, 2025
- 11.TSMC 2024 Annual Report — water consumption 129 million m³TSMC · Apr 1, 2025
- 12.Sustainable by design: next-generation datacenters consume zero water for coolingMicrosoft · Dec 9, 2024
- 13.Measuring energy and water efficiency for Microsoft datacentersMicrosoft · Jan 1, 2025
- 14.Circular datacenter infographic — 90.9% of servers and components reused or recycled in 2024Microsoft · Apr 15, 2025
- 15.Meta 2025 Sustainability ReportMeta · Sep 12, 2025
- 16.2025 Environmental Data Index (18.4 TWh of electricity in 2024)Meta · Sep 12, 2025
- 17.Llama 4 model card — training greenhouse gas emissionsMeta (model card) · Apr 5, 2025
- 18.Llama 3.1 model card — training greenhouse gas emissionsMeta (model card) · Jul 23, 2024
- 19.2024 Amazon Sustainability Report — AWS summaryAmazon · Jul 16, 2025
- 20.Takeaways from the Amazon Sustainability ReportAmazon · Jul 16, 2025
- 21.Amazon 2025 Sustainability Report — year in review (PUE 1.14)Amazon · Jul 1, 2026
- 22.AWS Project Rainier: the AI compute cluster powered by Trainium chipsAmazon · Oct 29, 2025
- 23.Expanding our use of Google Cloud TPUs and services (up to one million TPUs, well over a gigawatt in 2026)Anthropic · Oct 23, 2025
- 24.Perplexity case study — 100,000 queries an hour on Amazon EC2 P5 instancesAmazon Web Services · Jun 1, 2024
- 25.Cerebras powers Perplexity Sonar with the industry's fastest AI inferenceCerebras · Feb 11, 2025
- 26.Environmental Progress ReportApple · Apr 22, 2026
- 27.DeepSeek-V3 Technical ReportDeepSeek (arXiv 2412.19437) · Dec 26, 2024
- 28.Alibaba Group ESGAlibaba Group · Jul 1, 2025
- 29.NVIDIA corporate sustainability — FY2025 reportNVIDIA · Jun 12, 2025
- 30.Sustainability 2025: Oracle renews commitment to environmental goals (100% clean energy for AI clusters by 2035)Oracle · Oct 15, 2025
- 31.Oracle and the environment (92% renewable electricity in the cloud)Oracle · Jan 1, 2025
- 32.Salesforce, partners unveil AI Energy Score to benchmark energy efficiency of AI modelsSalesforce · Feb 10, 2025
- 33.FY25 schedules of environmental and employee metricsSalesforce · Apr 1, 2025
- 34.IBM — Energy and climate (79.6% renewable electricity in 2024; PUE 1.41; 265 kt operational emissions)IBM · May 1, 2025
- 35.A peek at IBM's AI training infrastructure (Vela and Blue Vela)IBM Community · Aug 1, 2024
- 36.Baidu 2024 ESG Report (62.32 GWh renewable electricity; PUE 1.19)Baidu via sustainabilityreports.com · May 1, 2025
- 37.Tencent Carbon Neutrality Mid-Term Report (48.5% renewable electricity in 2025; PUE 1.246)Tencent · Apr 1, 2026
- 38.Tencent climate action hubTencent · Apr 1, 2026
- 39.Midjourney selects Google Cloud to power AI-generated creative platform (TPUs for training, GPU VMs for rendering)Google Cloud · Mar 14, 2023
- 40.Crusoe 2024 Impact Report (2.7 MtCO₂e avoided since 2018; Crusoe Cloud on 100% renewable energy; DFM divested to NYDIG)Crusoe · Jun 1, 2025
- 41.Crusoe's GHG footprint and the case for 'Scope 4' avoided emissionsCrusoe · Sep 1, 2024
- 42.Crusoe in Abilene (wind power, closed-loop cooling)Crusoe · Sep 1, 2025
- 43.Nebius publishes 2025 Sustainability Report (PUE 1.25; 19.5 GWh of heat to Mäntsälä; 0.018 L/kWh at a liquid-cooled site)Nebius · Apr 1, 2026
- 44.Cerebras announces six new AI datacenters across North America and Europe (300+ CS-3 in Oklahoma City)Cerebras · Mar 11, 2025
- 45.Cerebras CS-3 vs NVIDIA B200 (CS-3 draws up to 23 kW; ~3× compute per watt claimed)Cerebras · Apr 1, 2024
Press
- 1.Google says a typical AI text prompt only uses 5 drops of water — experts say that's misleadingThe Verge · Aug 21, 2025
- 2.Google's AI boom sends emissions, power use soaringAxios · Jun 30, 2026
- 3.Google's AI expansion weighs heavily on climate goalsTrellis · Jul 1, 2026
- 4.Google pushes water standards amid data center backlashAxios · Jun 3, 2026
- 5.We now know how much water Google's Oregon data centers use after The Dalles drops lawsuit against journalistsData Center Dynamics · Dec 20, 2022
- 6.Crusoe's Abilene data center officially live, serving Oracle and OpenAI's StargateData Center Dynamics · Sep 23, 2025
- 7.Stargate's first AI data center in Texas: 10 things you need to knowTechRepublic · Sep 24, 2025
- 8.What $500 billion of AI infrastructure actually looks like: inside OpenAI's Stargate (Altman: 'well over 1 million GPUs' by end-2025)Introl · Oct 1, 2025
- 9.OpenAI and Oracle to deploy 450,000 GB200 GPUs at Stargate Abilene data centerData Center Dynamics · Sep 24, 2025
- 10.AI data centers are getting built thanks to a permit common for dry cleaners (62 diesel generators, 10 turbines at Abilene)Latitude Media / Floodlight · Jul 9, 2026
- 11.Texas data centers are using a permit loophole to add gas plants next to homesThe Texas Tribune · Jul 9, 2026
- 12.Mistral AI publishes the first comprehensive life cycle assessment of a large language modelThe Decoder · Jul 22, 2025
- 13.Mistral AI raises $830m in debt financing for data center in Paris, France (13,800 GB300 GPUs, 44 MW)Data Center Dynamics · Mar 31, 2026
- 14.Google owns the most AI compute — and it built it its way (Epoch AI estimates by company)Network World · Apr 20, 2026
- 15.Nvidia's 1.36-tonne GB200 NVL72 rackThe Register · Mar 21, 2024
- 16.AI data centers seen deepening copper shortfall to 6 Mt by 2035 — BNEF (≈400,000 t a year this decade)Metals Wire · Oct 1, 2025
- 17.The data center boom is a diesel generator boom (10,500 units, 27 GW permitted in Virginia)Latitude Media · Feb 10, 2026
- 18.Salesforce, partners launch energy ratings for AI modelsESG Today · Feb 11, 2025
- 19.AI image generators: this is how much electricity generating images requires (0.05–3.58 Wh per image)heise online · Feb 10, 2026
- 20.Microsoft emissions up 23% since 2020, blames AI data centersData Center Dynamics · Jun 5, 2025
- 21.Microsoft's data center expansion drove 25% emissions spikeESG Dive · Jul 10, 2026
- 22.Microsoft's AI drive saw its carbon emissions grow by 25 percent in 2025Engadget · Jul 10, 2026
- 23.Microsoft unveils Fairwater AI datacenter in Wisconsin (hundreds of thousands of GB200s, closed-loop water)Converge Digest · Sep 18, 2025
- 24.Constellation to restart Three Mile Island unit, powering MicrosoftWorld Nuclear News · Sep 20, 2024
- 25.Entergy Louisiana gains regulatory approval for massive Meta power projectLouisiana Illuminator · Aug 20, 2025
- 26.Louisiana moves ahead with contentious gas power plants for Meta data centerStraight Arrow News · Aug 21, 2025
- 27.Mark Zuckerberg says Meta will have 1.3M GPUs for AI by year-endTechCrunch · Jan 24, 2025
- 28.Meta expands data center campus in Richland Parish, Louisiana to 5GW, will invest $50bnData Center Dynamics · Feb 4, 2026
- 29.In South Memphis, Elon Musk's Colossus operated gas turbines without appropriate permits, residents and activists claimInside Climate News · Jul 17, 2025
- 30.SELC to sue xAI over unpermitted gas turbine use at Memphis data centerData Center Dynamics · Jun 18, 2025
- 31.NAACP, others appeal xAI turbine permits for Memphis data centerTennessee Lookout · Jul 30, 2025
- 32.xAI deploys 19 natural gas turbines at Colossus 2 data center in Southaven, Mississippi — report (46 units on site)Data Center Dynamics · May 14, 2026
- 33.Elon Musk's xAI to build $80m wastewater treatment plant for Memphis supercomputer (13 million gallons a day)Data Center Dynamics · Aug 20, 2025
- 34.Why did xAI pause construction of its wastewater treatment plant? (Colossus 1 uses >1 million gallons a day)FOX13 Memphis · Apr 10, 2026
- 35.Amazon's carbon emissions grow by 16 percent in 2025 on the back of record data center capacity additions (80.85 Mt)Data Center Dynamics · Jul 1, 2026
- 36.AI startup Anthropic announces $50 billion data center investment (Texas and New York, with Fluidstack)IndustryWeek · Nov 12, 2025
- 37.Microsoft, Nvidia deepen ties with Anthropic as startup commits $30 billion to Azure (up to 1 GW)Pure AI · Nov 18, 2025
- 38.Apple extends Private Cloud Compute to third-party data centersHelp Net Security · Jun 10, 2026
- 39.Apple starts shipping its made-in-America AI servers, beating 2026 targetMacTrast · Oct 24, 2025
- 40.DeepSeek reportedly has access to 50,000 Hopper GPUs and spent $1.6 billion on buildouts (SemiAnalysis)Tom's Hardware · Feb 2, 2025
- 41.Alibaba's FY2026 ESG report: 62.2% clean electricity, 73.6% at Alibaba Cloud's own data centres, net emissions 2.296 MtiTiger (Alibaba ESG report) · Jun 30, 2026
- 42.Alibaba Group to invest more in cloud and AI infrastructure in next three years than past decade (RMB 380bn)Data Center Dynamics · Feb 24, 2025
- 43.Nvidia reaches 100 percent renewable energy target (FY2025: 821 GWh, Scope 3 up to 6.9 Mt)Data Center Dynamics · Jun 13, 2025
- 44.AI startup Cohere and CoreWeave plan multibillion-dollar data center in Canada (C$240m federal backing)Data Center Dynamics · Dec 6, 2024
- 45.Cohere's Command A runs on two GPUsThe Logic · Mar 13, 2025
- 46.CoreWeave's 250,000-strong GPU fleet undercuts the big cloudsThe Next Platform · Mar 6, 2025
- 47.CoreWeave files for IPO on Nasdaq (32 data centers, 250,000+ GPUs, 360 MW active, 1.3 GW contracted)Data Center Dynamics · Mar 4, 2025
- 48.Salesforce goes full circle to launch Agentforce 360 for AWSTechstrong.ai · Oct 14, 2025
- 49.IBM promises to be net zero by 2030Data Center Dynamics · Feb 16, 2021
- 50.ByteDance pledges to be operationally carbon neutral by 2030Data Center Dynamics · Mar 14, 2023
- 51.TikTok owner ByteDance to expand Malaysia data center footprint in $2.1bn AI dealData Center Dynamics · Jun 7, 2024
- 52.Malaysia's AI data center boom strains power grid and water supply (5.8 GW pipeline)CO/AI · Aug 1, 2025
- 53.TikTok owner ByteDance criticized in Greenpeace report on Chinese cloud providersData Center Dynamics · Oct 20, 2022
- 54.ByteDance plans $14 billion Nvidia H200 chip purchase to expand AI capacity (RMB 85bn spent in 2025; Doubao 50T tokens a day)Analytics Insight · Dec 10, 2025
- 55.Baidu obtains just five percent of energy from renewable sources — GreenpeaceData Center Dynamics · May 15, 2024
- 56.China's Baidu says its 30,000-chip Kunlun cluster can train DeepSeek-like modelsReuters via Yahoo Finance · Apr 25, 2025
- 57.Tencent's capex down 24% YoY due to lack of access to GPUsData Center Dynamics · Nov 14, 2025
- 58.Sam Altman and Dario Amodei are walking back their AI apocalypse prophecies as IPOs nearFortune · May 26, 2026
- 59.AI cloud firm Lambda targets data center deployment in Kansas City, Missouri (24 MW, 10,000+ Blackwell Ultra GPUs)Data Center Dynamics · Oct 15, 2025
- 60.Microsoft signs multi-billion dollar cloud capacity deal with Lambda (18,000 GPUs leased to NVIDIA)Data Center Dynamics · Nov 3, 2025
- 61.AI cloud company Lambda raises more than $1.5bn in Series E funding roundData Center Dynamics · Nov 18, 2025
- 62.Nebius inks $17.4B deal with Microsoft for AI infrastructureConverge Digest · Sep 8, 2025
- 63.The hidden environmental costs of a single AI prompt (Sasha Luccioni, Hugging Face)Masters of Scale · Jun 1, 2025
- 64.Nvidia confirms $20 billion Groq deal to bolster AI inference dominanceTom's Hardware · Dec 24, 2025
- 65.Groq leases space at Equinix data center in Helsinki, FinlandData Center Dynamics · Jul 7, 2025
- 66.AI chip startup Groq secures $1.5 billion commitment from Saudi ArabiaReuters via Yahoo Finance · Feb 10, 2025
- 67.AI startup Groq plans to establish more than a dozen data centers next yearData Center Dynamics · Oct 3, 2025
- 68.Cerebras Systems raises $1.1B Series G at $8.1B valuationHPCwire · Sep 30, 2025
- 69.Zhipu leads China's 'AI tigers' with Hong Kong IPO (HK$4.35bn raised; 70% for model training)eWeek · Jan 8, 2026
- 70.Zhipu AI builds a 1 GW data center using only domestic chips (Bloomberg, via KuCoin News)KuCoin News · Mar 1, 2026
- 71.Moonshot AI's CEO says reported $4.6 million cost of training Kimi K2 'isn't official'Yicai Global · Nov 12, 2025
- 72.Moonshot's $4.6 million Kimi K2 Thinking takes top spots on reasoning benchmarks (trained on H800s)Implicator · Nov 7, 2025
- 73.ChatGPT users send 2.5 billion prompts a dayTechCrunch · Jul 21, 2025
- 74.Sam Altman says ChatGPT has hit 800M weekly active usersTechCrunch · Oct 6, 2025
NGOs & advocacy
- 1.The Dalles settles public records lawsuit over Google's data centersReporters Committee for Freedom of the Press · Dec 16, 2022
- 2.SCI for AI and the EU AI ActGreen Software Foundation · Mar 1, 2025
Research
- 1.Google's custom TPUs give it the world's largest AI compute fleetEpoch AI · Apr 15, 2026
- 2.How much energy does ChatGPT use?Epoch AI · Feb 7, 2025
- 3.OpenAI Stargate: where the US sites standEpoch AI · Apr 15, 2026
- 4.Behind-the-meter data centers: Stargate AbileneCleanview · Feb 1, 2026
- 5.Berkeley Lab report evaluates increase in electricity demand from data centersLawrence Berkeley National Laboratory · Dec 20, 2024
- 6.Hyperscalers control most of the world's AI compute (71% as of Q4 2025)Epoch AI · Apr 15, 2026
- 7.Our estimates of how much computing power is used by the world's largest AI developersEpoch AI · Mar 1, 2026
- 8.Generative AI has a massive e-waste problem (Wang et al., Nature Computational Science)IEEE Spectrum · Oct 28, 2024
- 9.The growing energy footprint of artificial intelligence (de Vries, Joule)Cell Press via EurekAlert · Oct 10, 2023
- 10.Life cycle assessment of pre-training Lucie 7B on the Jean Zay supercomputer (164 kg CO₂e per H100, 1,400 kg per host node)arXiv 2607.05408 · Jul 8, 2026
- 11.AI-driven copper boom overhyped? (20–40 t of copper per MW)S&P Global Market Intelligence · Jun 26, 2024
- 12.Consumptive water use for US power production (0.47 gal / 1.8 L per kWh at thermoelectric plants)NREL via EPA · Jan 1, 2012
- 13.Reviewing fleet-average onsite water and infrastructure energy efficiency for the top twenty global data center operatorsKoomey Analytics · May 1, 2025
- 14.The environmental cost of AI's energy use: carbon, water and land footprintsUnited Nations University · Feb 1, 2025
- 15.AI Energy Score — leaderboard and methodologyHugging Face, Salesforce, Cohere, Carnegie Mellon · Feb 10, 2025
- 16.Power Hungry Processing: Watts Driving the Cost of AI Deployment?Luccioni, Jernite, Strubell (arXiv 2311.16863) · Nov 28, 2023
- 17.Microsoft opens new windows into renewable investment (37 TWh consumed in 2025, 40 GW contracted)S&P Global Energy · Sep 7, 2026
- 18.xAI's Colossus 2: first gigawatt datacenter in the world (~200k H100/H200 + 30k GB200, ~300 MW at Colossus 1)SemiAnalysis · Sep 16, 2025
- 19.Baidu GHG emissions 2024: Scope 1 20.6 kt, Scope 2 777 kt location-based (compiled from the 2024 ESG report)Tracenable · Jun 1, 2025
- 20.Behind-the-meter data centers: Nebius Vineland (328 MW of Bloom fuel cells, air permit pending)Cleanview · Feb 1, 2026
- 21.Microsoft–Nebius New Jersey data center (≈57,000 H100-equivalents on 50 MW)Epoch AI · Aug 24, 2026
- 22.Estimating the carbon footprint of BLOOM, a 176B parameter language modelLuccioni, Viguier, Ligozat (arXiv 2211.02001) · Nov 3, 2022
- 23.Zhipu AI: compute service fees (RMB 1.55bn in 2024) and training-cost estimatesDolphin Research (Longbridge) · Dec 20, 2025
Regulators & agencies
- 1.Energy and AI — Executive summaryInternational Energy Agency · Apr 10, 2025
- 2.Data Centers and Their Energy Consumption: Frequently Asked QuestionsCongressional Research Service · May 12, 2026
- 3.EU AI Act — Annex XI: technical documentation for general-purpose AI modelsartificialintelligenceact.eu · Jul 12, 2024
- 4.General-Purpose AI Code of PracticeEuropean Commission (via artificialintelligenceact.eu) · Jul 10, 2025
- 5.NVIDIA Form 10-K, fiscal 2025US Securities and Exchange Commission · Feb 26, 2025
- 6.Baidu Form 20-F, fiscal 2024 — ESG and 2030 carbon-neutrality commitmentsUS Securities and Exchange Commission · Mar 28, 2025
- 7.How much electricity does an American home use? (10,791 kWh per residential customer in 2022)U.S. Energy Information Administration · Jan 8, 2024