A trillion-parameter open model trained on sanctioned H800s; no footprint published.

Beijing, China·moonshot.ai ·Verified Oct 17, 2026
CMostly estimates
Index score
Mostly estimates

In plain words

How scores work

Moonshot scores 38 out of 100 — laggard. Little or no disclosure, fossil-backed capacity, or active disputes with regulators and communities. Confidence in this score is mostly estimates (C).

What helps

  • Efficiency · 1T total / 32B active mixture of experts with open weights; the company says it trained 'at a much lower cost than American companies'.
  • Transparency · Open weights and technical reports for K2.

What hurts

  • Efficiency · No measurement published by the company.
  • Carbon · Chinese grid; no renewable procurement disclosed.
  • Water · No water data.

What nobody knows

  • Per-prompt energy disclosed
  • Per-prompt water disclosed
  • Annual environmental report
  • Location-based Scope 2 reported
  • Data-center locations public
  • +3 more

Moonshot's Kimi K2 and K2 Thinking are open-weight, trillion-parameter mixture-of-experts models (32B active) trained on NVIDIA H800s bought before export sanctions; a CNBC-sourced $4.6 million training cost circulated widely but the CEO says it 'is not an official number'. Backed by Alibaba and Tencent, Moonshot serves Kimi from Chinese data centres and publishes no energy, water or emissions data.

Products
Kimi K2 / K2 Thinking · Kimi app · Kimi API
Hosting
Own H800 clusters and Alibaba Cloud / Tencent Cloud capacity in China.

Key figures

Per-prompt and fleet metrics. Hover a title for what it means; open “How we got this number” for the working.

How to read the labels:Company figureCompany figure. Published by the company itself. We take it as given and record the scope next to it.Measured independentlyMeasured independently. Measured or estimated by researchers or analysts with no stake in the result.ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.— hover any label.
Energy per promptElectricity used to answer one typical request. Under 0.3 Wh is good. A 10 W LED bulb uses 0.3 Wh in about two minutes.
0.20
Wh / typical prompt
≈ 16.7 smartphone charges per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.ImplicatorEpoch AI

ecogpt.co estimate; no company figure.

How we got this number

Kimi K2 is a trillion-parameter mixture-of-experts model with 32B active parameters — DeepSeek-V3's class — so about two thirds of a dense frontier model's work. Uncertainty roughly ±3×.

Water per promptWater evaporated cooling the servers for one request. Scope matters: on-site cooling only, or also the water used to generate the electricity (which adds ≈1.8 mL per Wh).
0.20
mL / typical prompt
≈ 0.40 500 mL bottles per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.ImplicatorEpoch AIKoomey Analytics

On-site cooling only, so comparable with Google and OpenAI's figures.

How we got this number

0.2 Wh per prompt × 1 L/kWh (estimated WUE for Chinese colocation sites). Counting the water evaporated to generate the electricity adds ≈0.36 mL.

Carbon per promptGreenhouse gas from one request on the grid where it actually runs. Below 0.1 g is clean. A kilometre in a petrol car is about 170 g.
0.116
gCO₂e / typical prompt
≈ 0.68 km driven (petrol car) per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.ImplicatorEpoch AI

Location-based: what the grid actually emitted. Renewable certificates would bring the market-based figure near zero.

How we got this number

0.2 Wh × 580 gCO₂/kWh (Chinese grid, location-based).

Annual emissionsThe company's whole yearly footprint, in million tonnes of CO₂e. Clouds and device makers dwarf pure labs because they also count shops, logistics or products. Compare the trend, not the size.
0.16
MtCO₂e / year (AI compute only)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Yicai Global

Location-based estimate for the AI fleet only; not comparable with a full corporate inventory.

How we got this number

39 MW × 8,760 h × 80% utilisation × 580 gCO₂/kWh (Chinese grid). Compute only — nothing else the company does is counted.

Emissions trendDirection of travel against last year or the company's own baseline. Negative is good. Positive means the AI build-out is outrunning clean energy.
+100
% (K2 Thinking and user growth)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Implicator
How we got this number

No inventory exists; serving a trillion-parameter model to a fast-growing user base roughly doubles compute year on year.

Water per kWh (WUE)Litres of water consumed per kilowatt-hour of server electricity, across the fleet. 0.15 is excellent, 0.3 is good, 1.8 is the US data-centre average.
1.00
L/kWh
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Koomey Analytics
How we got this number

No disclosure; mainland Chinese sites mostly use evaporative cooling. 1.0 L/kWh is a mid-range assumption.

Clean electricityShare of electricity matched with renewable or carbon-free sources. Annual matching counts certificates bought anywhere; hourly matching on the same grid is far stricter.
35.0
% non-fossil electricity (grid share, no procurement)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Implicator
How we got this number

China's grid is about 35% non-fossil; Moonshot discloses no renewable purchases.

Hardware & materials

The chips, power, copper and future e-waste behind the fleet — the part sustainability reports leave out

Factors we use
AI chips in service
30,000
H800-class GPUs (order of magnitude)
≈ 417 racks of 72 GPUs
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Yicai GlobalTom's Hardware

GPUs, TPUs or custom accelerators the company runs. Analyst figures are in H100-equivalents, company figures in physical chips.

How we got this number

Moonshot trained K2 on pre-sanction NVIDIA H800s and discloses no fleet size; a DeepSeek-scale lab (≈50,000 Hopper GPUs) is the closest analogue, and Moonshot is smaller. ±2×.

Power draw
39.0
MW
≈ 29,250 US homes' worth of power
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Yicai GlobalTom's HardwareSemiAnalysis

Megawatts the AI fleet pulls. One megawatt runs roughly 750 US homes.

How we got this number

30,000 accelerators × 1.3 kW each, all-in. Fleet power implied by the chip count.

Electricity a year
0.27
TWh / year
≈ 25,714 US homes for a year
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Yicai GlobalTom's HardwareSemiAnalysis

Terawatt-hours per year. One TWh is a year of electricity for about 95,000 US homes.

How we got this number

39 MW × 8,760 h × 80% utilisation. Compute fleet only.

Carbon baked into the hardware
15.4
ktCO₂e embodied in chips and servers
≈ 3,348 petrol cars driven for a year
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Yicai GlobalTom's HardwarearXiv 2607.05408NVIDIA developer blog

CO₂e emitted making the chips and servers before they answer a single prompt.

How we got this number

30,000 accelerators × 514 kg CO₂e each (chip plus share of the host server). Emitted in manufacturing, before the first prompt is served.

Future e-waste
510
tonnes of servers to retire within ~5 years
≈ 2.8 empty Boeing 747s by weight
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Yicai GlobalTom's HardwareNVIDIAThe Register

Tonnes of server hardware that will be retired in three to five years.

How we got this number

30,000 accelerators × 17 kg of server hardware each. Tomorrow's e-waste unless reused; generative AI could produce 2.5 Mt of it a year by 2030.

Copper in the build
1,053
tonnes of copper in the build
≈ copper for 12,687 electric cars
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Yicai GlobalTom's HardwareSemiAnalysisBHPS&P Global Market Intelligence

Tonnes of copper in cabling, busbars and transformers.

How we got this number

39 MW × 27 t of copper per MW (cabling, busbars, transformers).

Fossil generators on site
15.0
backup diesel generators (implied)
≈ 39 MW of backup capacity
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Yicai GlobalTom's HardwareSemiAnalysisLatitude MediaLatitude Media / Floodlight

Diesel backup units or gas turbines at the data centres, permitted or observed.

How we got this number

39 MW ÷ 2.6 MW per generator, the average size permitted at US data centres. Permit counts are not published fleet-wide; this is the number a fleet this size normally carries.

Hardware reused or recycled
—
No hardware reuse or e-waste figure published.
Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.

Share of retired servers and parts given a second life.

Mineral depletion
—
Only Mistral has published a mineral-depletion figure.
Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.

Kilograms of antimony-equivalent, the life-cycle unit for scarce minerals consumed.

Score breakdown

Each pillar is 0–100; weights are fixed across the index

Energy efficiency — How much electricity one answer costs.weight 20% · confidence C
65
  • 1T total / 32B active mixture of experts with open weights; the company says it trained 'at a much lower cost than American companies'. ImplicatorYicai Global
  • No measurement published by the company. Yicai Global
Carbon intensity — How clean that electricity is, and whether total emissions are rising.weight 25% · confidence C
28
  • Chinese grid; no renewable procurement disclosed. Implicator
Water — How much water the data centres consume, and whether it is replaced.weight 15% · confidence D
30
Transparency — How much the company actually publishes.weight 20% · confidence C
35
  • Open weights and technical reports for K2. Implicator
  • No environmental data; the widely quoted training cost is unofficial and the CEO declines to quantify it. Yicai Global
Commitments — Whether it has dated, measurable climate and water targets.weight 10% · confidence C
10
Conduct — How it behaves: permits, lawsuits, gas turbines, community water.weight 10% · confidence C
55

Models

What this company ships, and what each prompt costs

ModelWeightsEnergy / promptWaterTraining CO₂e
Kimi K2 Thinking
1T total / 32B active (MoE)
Open0.20 Wh Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.0.200 mL Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.1,500 t Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.

Where the compute lives

Named sites from company disclosures and press reporting

OperationalConstructionPlanned
  • Beijing HQBeijing, China
  • Alibaba Cloud / Tencent Cloud regionsChina