Cohere

Co-author of the AI Energy Score, with no footprint report of its own.

Toronto, Canada·cohere.com ·Verified Oct 16, 2026
CMostly estimates
Index score
Mostly estimates

In plain words

How scores work

Cohere scores 49 out of 100 — middle of the pack. Some disclosure or clean-energy commitments, offset by rising emissions or blind spots. Confidence in this score is mostly estimates (C).

What helps

  • Efficiency · Command A (111B dense) serves on two H100s at 156 tokens a second — a deliberately small footprint for a frontier-class model; DeepSeek-V3 needs eight GPUs for the same context length.
  • Conduct · No enforcement actions; backs a public efficiency benchmark that lets customers compare models.

What hurts

  • Efficiency · No per-prompt energy figure published, despite co-creating the benchmark that measures it.
  • Carbon · No procurement or inventory of its own.
  • Commitments · No public climate or water targets.

What nobody knows

  • Per-prompt energy disclosed
  • Per-prompt water disclosed
  • Training emissions in model cards
  • Annual environmental report
  • Location-based Scope 2 reported
  • +2 more

Cohere builds the Command family for enterprises, serves it on Oracle Cloud, AWS, Azure and Google Cloud, and is anchor tenant of a multibillion-dollar CoreWeave-built data centre in Canada backed by C$240 million of federal money. It co-created the AI Energy Score benchmark with Salesforce, Hugging Face and Carnegie Mellon, and Command A is engineered to serve on two GPUs — but Cohere discloses no energy, water or emissions figures and has no climate targets.

Products
Command A · Command R+ · Embed · Rerank · North
Hosting
Oracle Cloud (OCI), AWS Bedrock, Azure and Google Cloud; anchor tenant of a CoreWeave-built Canadian data centre.

Key figures

Per-prompt and fleet metrics. Hover a title for what it means; open “How we got this number” for the working.

How to read the labels:Company figureCompany figure. Published by the company itself. We take it as given and record the scope next to it.Measured independentlyMeasured independently. Measured or estimated by researchers or analysts with no stake in the result.ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.— hover any label.
Energy per promptElectricity used to answer one typical request. Under 0.3 Wh is good. A 10 W LED bulb uses 0.3 Wh in about two minutes.
0.40
Wh / typical prompt
≈ 33.3 smartphone charges per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.The LogicEpoch AI

ecogpt.co estimate; no company figure.

How we got this number

Command A is a 111B dense model that Cohere serves on two H100s; dense models of that size sit a little above Epoch's 0.3 Wh for a typical GPT-4o query. Uncertainty roughly ±3×.

Water per promptWater evaporated cooling the servers for one request. Scope matters: on-site cooling only, or also the water used to generate the electricity (which adds ≈1.8 mL per Wh).
0.12
mL / typical prompt
≈ 0.24 500 mL bottles per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.The LogicEpoch AIMicrosoft

On-site cooling only, so comparable with Google and OpenAI's figures.

How we got this number

0.4 Wh per prompt × 0.3 L/kWh (estimated WUE across OCI, Azure and CoreWeave hosts). Counting the water evaporated to generate the electricity adds ≈0.72 mL.

Carbon per promptGreenhouse gas from one request on the grid where it actually runs. Below 0.1 g is clean. A kilometre in a petrol car is about 170 g.
0.156
gCO₂e / typical prompt
≈ 0.92 km driven (petrol car) per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.The LogicEpoch AI

Location-based: what the grid actually emitted. Renewable certificates would bring the market-based figure near zero.

How we got this number

0.4 Wh × 390 gCO₂/kWh (US grid, location-based).

Annual emissionsThe company's whole yearly footprint, in million tonnes of CO₂e. Clouds and device makers dwarf pure labs because they also count shops, logistics or products. Compare the trend, not the size.
0.07
MtCO₂e / year (AI compute only)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Data Center Dynamics

Location-based estimate for the AI fleet only; not comparable with a full corporate inventory.

How we got this number

26 MW × 8,760 h × 80% utilisation × 390 gCO₂/kWh (US grid). Compute only — nothing else the company does is counted.

Emissions trendDirection of travel against last year or the company's own baseline. Negative is good. Positive means the AI build-out is outrunning clean energy.
+100
% (Canadian data centre coming online)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Data Center Dynamics
How we got this number

The CoreWeave-built site roughly doubles Cohere's dedicated capacity when it opens; no inventory exists to measure against.

Water per kWh (WUE)Litres of water consumed per kilowatt-hour of server electricity, across the fleet. 0.15 is excellent, 0.3 is good, 1.8 is the US data-centre average.
0.30
L/kWh
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Microsoft
How we got this number

No disclosure. Azure reports 0.30 L/kWh and CoreWeave's dense liquid-cooled racks are similar or lower; OCI publishes nothing.

Clean electricityShare of electricity matched with renewable or carbon-free sources. Annual matching counts certificates bought anywhere; hourly matching on the same grid is far stricter.
80.0
% (blend of host claims and Canadian grid)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.OracleData Center Dynamics
How we got this number

OCI public cloud and AWS match 100% annually; Canada's grid is about 80% non-fossil. Cohere has no procurement of its own.

Hardware & materials

The chips, power, copper and future e-waste behind the fleet — the part sustainability reports leave out

Factors we use
AI chips in service
20,000
GPU-equivalents (order of magnitude)
≈ 278 racks of 72 GPUs
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Data Center Dynamics

GPUs, TPUs or custom accelerators the company runs. Analyst figures are in H100-equivalents, company figures in physical chips.

How we got this number

Cohere publishes no fleet size. Anchor tenancy of a multibillion-dollar CoreWeave-built site in Canada (likely 50–100 MW when complete) plus leased capacity on Oracle, AWS, Azure and Google points to tens of thousands of GPU-equivalents. Uncertainty ±3×.

Power draw
26.0
MW
≈ 19,500 US homes' worth of power
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsSemiAnalysis

Megawatts the AI fleet pulls. One megawatt runs roughly 750 US homes.

How we got this number

20,000 accelerators × 1.3 kW each, all-in. Fleet power implied by the chip count.

Electricity a year
0.18
TWh / year
≈ 17,143 US homes for a year
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsSemiAnalysis

Terawatt-hours per year. One TWh is a year of electricity for about 95,000 US homes.

How we got this number

26 MW × 8,760 h × 80% utilisation. Compute fleet only.

Carbon baked into the hardware
10.3
ktCO₂e embodied in chips and servers
≈ 2,239 petrol cars driven for a year
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsarXiv 2607.05408NVIDIA developer blog

CO₂e emitted making the chips and servers before they answer a single prompt.

How we got this number

20,000 accelerators × 514 kg CO₂e each (chip plus share of the host server). Emitted in manufacturing, before the first prompt is served.

Future e-waste
340
tonnes of servers to retire within ~5 years
≈ 1.9 empty Boeing 747s by weight
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsNVIDIAThe Register

Tonnes of server hardware that will be retired in three to five years.

How we got this number

20,000 accelerators × 17 kg of server hardware each. Tomorrow's e-waste unless reused; generative AI could produce 2.5 Mt of it a year by 2030.

Copper in the build
702
tonnes of copper in the build
≈ copper for 8,458 electric cars
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsSemiAnalysisBHPS&P Global Market Intelligence

Tonnes of copper in cabling, busbars and transformers.

How we got this number

26 MW × 27 t of copper per MW (cabling, busbars, transformers).

Fossil generators on site
10.0
backup diesel generators (implied)
≈ 26 MW of backup capacity
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsSemiAnalysisLatitude MediaLatitude Media / Floodlight

Diesel backup units or gas turbines at the data centres, permitted or observed.

How we got this number

26 MW ÷ 2.6 MW per generator, the average size permitted at US data centres. Permit counts are not published fleet-wide; this is the number a fleet this size normally carries.

Hardware reused or recycled
—
No hardware reuse or e-waste figure published.
Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.

Share of retired servers and parts given a second life.

Mineral depletion
—
Only Mistral has published a mineral-depletion figure.
Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.

Kilograms of antimony-equivalent, the life-cycle unit for scarce minerals consumed.

Score breakdown

Each pillar is 0–100; weights are fixed across the index

Energy efficiency — How much electricity one answer costs.weight 20% · confidence B
68
  • Command A (111B dense) serves on two H100s at 156 tokens a second — a deliberately small footprint for a frontier-class model; DeepSeek-V3 needs eight GPUs for the same context length. The Logic
  • No per-prompt energy figure published, despite co-creating the benchmark that measures it. Hugging Face, Salesforce, Cohere, Carnegie Mellon
Carbon intensity — How clean that electricity is, and whether total emissions are rising.weight 25% · confidence C
55
Water — How much water the data centres consume, and whether it is replaced.weight 15% · confidence D
48
  • No water data; inherits hosts' WUE (AWS 0.15 L/kWh, Azure 0.30, OCI undisclosed). AmazonMicrosoft
Transparency — How much the company actually publishes.weight 20% · confidence C
30
Commitments — Whether it has dated, measurable climate and water targets.weight 10% · confidence C
15
Conduct — How it behaves: permits, lawsuits, gas turbines, community water.weight 10% · confidence C
65

Models

What this company ships, and what each prompt costs

ModelWeightsEnergy / promptWaterTraining CO₂e
Command A
111B dense
Open0.40 Wh Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.0.120 mL Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.2,000 t Estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.

Where the compute lives

Named sites from company disclosures and press reporting

OperationalConstructionPlanned
  • Toronto HQ / leased cloudOntario, Canada
  • CoreWeave-built siteCanada (location undisclosed) · Multibillion-dollar; C$240M federal backing.
  • Oracle Cloud regionsUSA