#27 of 30 · GPU cloud
CoreWeave
250,000 GPUs, 1.3 GW contracted, not one sustainability number.
In plain words
How scores workCoreWeave scores 34 out of 100 — laggard. Little or no disclosure, fossil-backed capacity, or active disputes with regulators and communities. Confidence in this score is little data (D).
What helps
- Nothing on record.
What hurts
- Carbon · No renewable procurement or carbon disclosure; much US capacity sits on Texas and Pennsylvania grids, with Nordic sites on hydro.
- Transparency · The IPO prospectus and subsequent reports carry no environmental metrics at all.
- Commitments · No targets.
What nobody knows
- Per-prompt energy disclosed
- Per-prompt water disclosed
- Training emissions in model cards
- Annual environmental report
- Location-based Scope 2 reported
- +3 more
CoreWeave — a former Ethereum miner — ran more than 250,000 GPUs across 32 data centres with 360 MW of active power at the end of 2024, with 1.3 GW contracted and a target of 1.7 GW by end-2026. It hosts OpenAI, Microsoft, Cohere's Canadian site and NVIDIA's own capacity. Its IPO filing contains no emissions, energy-mix or water disclosure and the company has no climate targets.
Key figures
Per-prompt and fleet metrics. Hover a title for what it means; open “How we got this number” for the working.
ecogpt.co estimate; no company figure.
How we got this number
CoreWeave hosts frontier inference and training for OpenAI, Microsoft and others; the 0.3 Wh Epoch estimates for a typical frontier query is the representative workload. Uncertainty roughly ±3×.
On-site cooling only, so comparable with Google and OpenAI's figures.
How we got this number
0.3 Wh per prompt × 0.3 L/kWh (estimated WUE for liquid-cooled dense racks). Counting the water evaporated to generate the electricity adds ≈0.54 mL.
Location-based: what the grid actually emitted. Renewable certificates would bring the market-based figure near zero.
How we got this number
0.3 Wh × 390 gCO₂/kWh (US grid, location-based).
Location-based estimate for the AI fleet only; not comparable with a full corporate inventory.
How we got this number
360 MW × 8,760 h × 80% utilisation × 390 gCO₂/kWh (US grid). Compute only — nothing else the company does is counted.
How we got this number
Active power grew from 360 MW at end-2024 to about 850 MW during 2025, with 1.7 GW targeted for end-2026.
How we got this number
No disclosure. Liquid-cooled GB200 racks in leased facilities; comparable to Azure's 0.30 L/kWh.
How we got this number
The US grid is about 40% non-fossil; CoreWeave discloses no renewable purchases, and its Nordic sites are a small share of capacity.
Hardware & materials
The chips, power, copper and future e-waste behind the fleet — the part sustainability reports leave out
GPUs, TPUs or custom accelerators the company runs. Analyst figures are in H100-equivalents, company figures in physical chips.
How we got this number
Mostly H100, with H200 and GB200 arriving; 684,000 GPUs contracted as of mid-2026 per market trackers.
Megawatts the AI fleet pulls. One megawatt runs roughly 750 US homes.
How we got this number
1.3 GW contracted; 1.7 GW targeted by end-2026.
Terawatt-hours per year. One TWh is a year of electricity for about 95,000 US homes.
How we got this number
360 MW × 8,760 h × 80% utilisation. Compute fleet only.
CO₂e emitted making the chips and servers before they answer a single prompt.
How we got this number
250,000 accelerators × 514 kg CO₂e each (chip plus share of the host server). Emitted in manufacturing, before the first prompt is served.
Tonnes of server hardware that will be retired in three to five years.
How we got this number
250,000 accelerators × 17 kg of server hardware each. Tomorrow's e-waste unless reused; generative AI could produce 2.5 Mt of it a year by 2030.
Tonnes of copper in cabling, busbars and transformers.
How we got this number
360 MW × 27 t of copper per MW (cabling, busbars, transformers).
Diesel backup units or gas turbines at the data centres, permitted or observed.
How we got this number
360 MW ÷ 2.6 MW per generator, the average size permitted at US data centres. Permit counts are not published fleet-wide; this is the number a fleet this size normally carries.
Share of retired servers and parts given a second life.
Kilograms of antimony-equivalent, the life-cycle unit for scarce minerals consumed.
Score breakdown
Each pillar is 0–100; weights are fixed across the index
- Dense, liquid-cooled GB200 NVL72 fleets; no workload-level data. The Next Platform
- No renewable procurement or carbon disclosure; much US capacity sits on Texas and Pennsylvania grids, with Nordic sites on hydro. Data Center Dynamics
- No water data; liquid cooling reduces evaporative use. The Next Platform
- The IPO prospectus and subsequent reports carry no environmental metrics at all. Data Center Dynamics
- No targets. Data Center Dynamics
- No enforcement actions on record; converted former crypto-mining sites to AI. Data Center Dynamics
Models
What this company ships, and what each prompt costs
No model-level entries — this company hosts or supplies others rather than serving its own models.
Where the compute lives
Named sites from company disclosures and press reporting
- Livingston HQNew Jersey, USA
- PlanoTexas, USA
- Denton (Core Scientific)Texas, USA · Converted crypto-mining site.
- Ellendale (Applied Digital)North Dakota, USA · 400 MW campus.
- CrawleyUnited Kingdom
- Oslo regionNorway · Hydro grid.