#29 of 30 · GPU cloud

Lambda

Tens of thousands of GPUs for Microsoft and NVIDIA; not one environmental number.

San Francisco, California·lambda.ai ·Verified Oct 17, 2026
DLittle data
Index score
Little data

In plain words

How scores work

Lambda scores 32 out of 100 — laggard. Little or no disclosure, fossil-backed capacity, or active disputes with regulators and communities. Confidence in this score is little data (D).

What helps

  • Nothing on record.

What hurts

  • Carbon · No renewable procurement or inventory disclosed; Kansas City sits on Evergy's coal-and-gas-heavy grid.
  • Water · No water data; mix of leased colocation and a retrofitted 2009 facility.
  • Transparency · No environmental disclosure of any kind in funding materials or on its site.

What nobody knows

  • Per-prompt energy disclosed
  • Per-prompt water disclosed
  • Training emissions in model cards
  • Annual environmental report
  • Location-based Scope 2 reported
  • +3 more

Lambda rents NVIDIA GPUs to AI labs and, since November 2025, to Microsoft under a multibillion-dollar deal; it leased about 18,000 GPUs to NVIDIA itself, raised $1.5 billion in a Series E and $1 billion of debt to buy more, and is converting a former bank data centre in Kansas City into a 24 MW site for 10,000-plus Blackwell Ultra GPUs. It publishes no emissions, energy, water or hardware data and has no climate targets.

Products
Lambda Cloud (1-Click Clusters) · Lambda Inference · On-prem GPU servers
Hosting
Leased and owned capacity in California (LAX01), Texas and Kansas City; GPU leases to Microsoft and NVIDIA.

Key figures

Per-prompt and fleet metrics. Hover a title for what it means; open “How we got this number” for the working.

How to read the labels:Company figureCompany figure. Published by the company itself. We take it as given and record the scope next to it.Measured independentlyMeasured independently. Measured or estimated by researchers or analysts with no stake in the result.ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.— hover any label.
Energy per promptElectricity used to answer one typical request. Under 0.3 Wh is good. A 10 W LED bulb uses 0.3 Wh in about two minutes.
0.30
Wh / typical prompt
≈ 25.0 smartphone charges per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Epoch AIData Center Dynamics

ecogpt.co estimate; no company figure.

How we got this number

Lambda rents GPUs to labs and to Microsoft for frontier workloads; Epoch's 0.3 Wh for a typical frontier query is the representative figure. Uncertainty roughly ±3×.

Water per promptWater evaporated cooling the servers for one request. Scope matters: on-site cooling only, or also the water used to generate the electricity (which adds ≈1.8 mL per Wh).
0.12
mL / typical prompt
≈ 0.24 500 mL bottles per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Epoch AIData Center DynamicsKoomey Analytics

On-site cooling only, so comparable with Google and OpenAI's figures.

How we got this number

0.3 Wh per prompt × 0.4 L/kWh (estimated WUE for leased colocation and a retrofitted site). Counting the water evaporated to generate the electricity adds ≈0.54 mL.

Carbon per promptGreenhouse gas from one request on the grid where it actually runs. Below 0.1 g is clean. A kilometre in a petrol car is about 170 g.
0.117
gCO₂e / typical prompt
≈ 0.69 km driven (petrol car) per 1,000 prompts
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Epoch AIData Center Dynamics

Location-based: what the grid actually emitted. Renewable certificates would bring the market-based figure near zero.

How we got this number

0.3 Wh × 390 gCO₂/kWh (US grid, location-based).

Annual emissionsThe company's whole yearly footprint, in million tonnes of CO₂e. Clouds and device makers dwarf pure labs because they also count shops, logistics or products. Compare the trend, not the size.
0.21
MtCO₂e / year (AI compute only)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Data Center Dynamics

Location-based estimate for the AI fleet only; not comparable with a full corporate inventory.

How we got this number

78 MW × 8,760 h × 80% utilisation × 390 gCO₂/kWh (US grid). Compute only — nothing else the company does is counted.

Emissions trendDirection of travel against last year or the company's own baseline. Negative is good. Positive means the AI build-out is outrunning clean energy.
+100
% (fleet roughly doubling on Series E and debt)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Data Center DynamicsData Center Dynamics
How we got this number

$1.5bn of equity and $1bn of debt earmarked for GPUs, plus a new 24 MW site, roughly double the fleet in a year.

Water per kWh (WUE)Litres of water consumed per kilowatt-hour of server electricity, across the fleet. 0.15 is excellent, 0.3 is good, 1.8 is the US data-centre average.
0.40
L/kWh
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Koomey Analytics
How we got this number

No disclosure. Leased colocation in California and Texas plus a retrofitted Kansas City building; 0.4 L/kWh is a mid-range assumption.

Clean electricityShare of electricity matched with renewable or carbon-free sources. Annual matching counts certificates bought anywhere; hourly matching on the same grid is far stricter.
40.0
% (US grid average non-fossil, no procurement)
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Data Center Dynamics
How we got this number

The US grid is about 40% non-fossil; Lambda discloses no renewable purchases.

Hardware & materials

The chips, power, copper and future e-waste behind the fleet — the part sustainability reports leave out

Factors we use
AI chips in service
60,000
GPUs (order of magnitude)
≈ 833 racks of 72 GPUs
ecogpt.co estimateecogpt.co estimate. Our own estimate from published factors. The working is shown next to the number; treat it as an order of magnitude, not a measurement.Data Center DynamicsData Center DynamicsData Center Dynamics

GPUs, TPUs or custom accelerators the company runs. Analyst figures are in H100-equivalents, company figures in physical chips.

How we got this number

About 18,000 GPUs leased to NVIDIA, 'tens of thousands' committed to Microsoft, and 10,000+ Blackwell Ultra GPUs planned for Kansas City, funded by a $1.5bn Series E and $1bn of debt. ±2×.

Power draw
78.0
MW
≈ 58,500 US homes' worth of power
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsData Center DynamicsData Center DynamicsSemiAnalysis

Megawatts the AI fleet pulls. One megawatt runs roughly 750 US homes.

How we got this number

60,000 accelerators × 1.3 kW each, all-in. Fleet power implied by the chip count.

Electricity a year
0.55
TWh / year
≈ 52,381 US homes for a year
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsData Center DynamicsData Center DynamicsSemiAnalysis

Terawatt-hours per year. One TWh is a year of electricity for about 95,000 US homes.

How we got this number

78 MW × 8,760 h × 80% utilisation. Compute fleet only.

Carbon baked into the hardware
30.8
ktCO₂e embodied in chips and servers
≈ 6,696 petrol cars driven for a year
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsData Center DynamicsData Center DynamicsarXiv 2607.05408NVIDIA developer blog

CO₂e emitted making the chips and servers before they answer a single prompt.

How we got this number

60,000 accelerators × 514 kg CO₂e each (chip plus share of the host server). Emitted in manufacturing, before the first prompt is served.

Future e-waste
1,020
tonnes of servers to retire within ~5 years
≈ 5.7 empty Boeing 747s by weight
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsData Center DynamicsData Center DynamicsNVIDIAThe Register

Tonnes of server hardware that will be retired in three to five years.

How we got this number

60,000 accelerators × 17 kg of server hardware each. Tomorrow's e-waste unless reused; generative AI could produce 2.5 Mt of it a year by 2030.

Copper in the build
2,106
tonnes of copper in the build
≈ copper for 25,373 electric cars
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsData Center DynamicsData Center DynamicsSemiAnalysisBHPS&P Global Market Intelligence

Tonnes of copper in cabling, busbars and transformers.

How we got this number

78 MW × 27 t of copper per MW (cabling, busbars, transformers).

Fossil generators on site
30.0
backup diesel generators (implied)
≈ 78 MW of backup capacity
DerivedDerived. Arithmetic on a disclosed or independent input using a published conversion factor.Data Center DynamicsData Center DynamicsData Center DynamicsSemiAnalysisLatitude MediaLatitude Media / Floodlight

Diesel backup units or gas turbines at the data centres, permitted or observed.

How we got this number

78 MW ÷ 2.6 MW per generator, the average size permitted at US data centres. Permit counts are not published fleet-wide; this is the number a fleet this size normally carries.

Hardware reused or recycled
—
No hardware reuse or e-waste figure published.
Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.

Share of retired servers and parts given a second life.

Mineral depletion
—
Only Mistral has published a mineral-depletion figure.
Not disclosedNot disclosed. The company publishes nothing on this and no defensible estimate exists.

Kilograms of antimony-equivalent, the life-cycle unit for scarce minerals consumed.

Score breakdown

Each pillar is 0–100; weights are fixed across the index

Energy efficiency — How much electricity one answer costs.weight 20% · confidence C
50
Carbon intensity — How clean that electricity is, and whether total emissions are rising.weight 25% · confidence C
35
  • No renewable procurement or inventory disclosed; Kansas City sits on Evergy's coal-and-gas-heavy grid. Data Center Dynamics
Water — How much water the data centres consume, and whether it is replaced.weight 15% · confidence D
40
Transparency — How much the company actually publishes.weight 20% · confidence D
5
Commitments — Whether it has dated, measurable climate and water targets.weight 10% · confidence C
10
Conduct — How it behaves: permits, lawsuits, gas turbines, community water.weight 10% · confidence C
55
  • No enforcement actions; reuses an idle 2009-era data centre in Kansas City rather than building greenfield. Data Center Dynamics

Models

What this company ships, and what each prompt costs

No model-level entries — this company hosts or supplies others rather than serving its own models.

Where the compute lives

Named sites from company disclosures and press reporting

OperationalConstructionPlanned
  • San Francisco HQCalifornia, USA
  • LAX01 (Prime)El Segundo, California, USA
  • Kansas CityMissouri, USA · 24 MW retrofit; 10,000+ Blackwell Ultra.